Zamani, Ahmad Badriez (2022) Penentuan Interval Penggantian Komponen Mesin Pengayakan BatuBara Dengan Metode Age Replacement. Jurnal Serambi Engineering, 8 (01). pp. 4341-4352. ISSN 2528-3561
|
Text
HALAMAN PERSETUJUAN PUBLIKASI JURNAL (3).pdf Download (12kB) | Preview |
|
|
Text (Artikel Publikasi)
JURNAL ARTIKEL ABZ.pdf Download (354kB) | Preview |
Abstract
PT X is a manufacturing industry company, where one of the machines used is the Coal Sieving Machine. Krena machines are used continuously meneurs, so regular maintenance is required. This machine has two critical components, namely the gearbox component and the V-Belt Conveyor. During this time, PT. X carries out suboptimal repair activities, namely technicians only replace components when there is damage that can cause downtime. The purpose of this study is to determine alternative time intervals for machine component replacement and analyze the implementation of appropriate preventive maintenance to reduce the total downtime that occurs with the age replacement method approach. The results of the study obtained the replacement time interval for Gearbox components at intervals of 14 days while on the V-Belt Conveyor components, namely at intervals of 16 days. The total cost of replacing gearbox components due to damage amounted to Rp. 3,286,955 and for the calculation of the total maintenance cost (TC*) of Rp. 56,549,187. As for the replacement of V-Belt Conveyor components due to damage amounting to Rp. 3,101,104 and for the calculation of the total maintenance cost (TC*) of Rp. 58,260,118.
Item Type: | Article |
---|---|
Uncontrolled Keywords: | Age Replacement, Downtime, Maintenance, Reliability, Optimal Time |
Subjects: | Engineering > Industrial Engineering Engineering |
Divisions: | Faculty of Engineering > Industrial Engineering Study Program |
Depositing User: | Ahmad Badriez Zamani |
Date Deposited: | 24 May 2023 03:36 |
Last Modified: | 24 May 2023 03:36 |
URI: | http://eprints.umg.ac.id/id/eprint/7757 |
Actions (login required)
View Item |