PERENCANAAN PERAWATAN MESIN PULVERIZER PADA PEMBANGKIT LISTRIK TENAGA UAP MENGUNAKAN METODE RELIABILITY CENTERED MAINTENANCE (RCM)

Hidayanti, Novi Nur (2021) PERENCANAAN PERAWATAN MESIN PULVERIZER PADA PEMBANGKIT LISTRIK TENAGA UAP MENGUNAKAN METODE RELIABILITY CENTERED MAINTENANCE (RCM). https://ejurnal.plm.ac.id/index.php/Teknovasi/index, 8 (3). p. 113. ISSN 2355-701x

[img] Text
Halaman Persetujuan Publikasi Jurnal - Novi Nur Hidanyati.pdf

Download (292kB)
[img] Text (Artikel Publikasi)
Perencanaan Perawatan Mesin Pulverizer Pada Pembangkit Listrik Tenaga Uap dengan Metode Reliability Centred Maintenance (RCM).pdf
Restricted to Repository staff only until 28 June 2027.

Download (514kB)
Official URL: https://ejurnal.plm.ac.id/index.php/Teknovasi/arti...

Abstract

Competition between companies today requires companies to continue to improve by improving the industrial system. Machine reliability is one of the programs to increase the competitiveness of a company in meeting consumer demand. The pulverizer machine is a very important supporting machine for producing electricity. The pulverizer has several components that are often damaged, such as the coal feeder, gearbox, hydraulic pump, and grinding roller, which causes the production process to experience downtime. This research is about planning the maintenance of machine components. This problem will be solved by using the FMEA approach with Reliability Centered Maintenance (RCM) to determine the failure mode and the effect of failure on critical components. There is 1 failure mode that has the highest Risk Priority Number value. The failure mode is a torn V-Belt. The results of the MTTR and MTTF calculations are used to determine the time interval for the torn V-Belt failure mode, the MTTF value is 735.32 hours or 30.6 days, MTTR is 44.84 hours or 1.8 days. Recommendations for appropriate action through the Task Selection V-Belt failure mode fall into category A, namely Safety Problem with Time Directed (TD) action and optimal scheduling planning of 15 days.

Item Type: Article
Uncontrolled Keywords: Scheduling, Failure Mode and Effect Analysis, Reliability Centered Maintenance, Task Selection, TDM
Subjects: Engineering > Industrial Engineering
Engineering
Divisions: Faculty of Engineering > Industrial Engineering Study Program
Depositing User: Novi Nur Hidayanti
Date Deposited: 28 Jun 2022 06:20
Last Modified: 28 Jun 2022 06:20
URI: http://eprints.umg.ac.id/id/eprint/5978

Actions (login required)

View Item View Item