Implementasi Metode House of Risk Pada Evaluasi Keterlambatan Proyek Cable Tray Support di PT. SSS

Fauzi, Muhammad Dany (2023) Implementasi Metode House of Risk Pada Evaluasi Keterlambatan Proyek Cable Tray Support di PT. SSS. Jurnal Serambi Engineering, 8 (4). pp. 6890-6899. ISSN 2541-1934

[img]
Preview
Text
Surat Persetujuan Publikasi Jurnal Muhammad Dany Fauzi.pdf

Download (370kB) | Preview
[img]
Preview
Text (Artikel Publikasi)
6671-15484-1-PB.pdf

Download (534kB) | Preview
Official URL: https://ojs.serambimekkah.ac.id/index.php/jse/inde...

Abstract

PT SSS is a company in the field of steel construction. In the Cable Tray Support project, delays occurred that affected the duration outside the contract. Projects have cost, quality, and time objectives that must be achieved. It requires good management of finance, equipment, materials, labor, and time. Therefore, project management is critical to the smoothness and success of the project. This research aims to identify delay problems through the House of Risk method, which analyzes risks, causative agents of delay, and mitigation strategies. There are 18 risks of delay with 21 causes identified, resulting in ten prioritized strategies, namely applying the material requirement planning method to find out more details of the lead time of each material, buying a lot at a lower price, looking for suppliers closer, overestimating the procurement index of certain types of materials, conducting strict and structured supervision to ensure the supply of appropriate goods from suppliers, evaluating the causes of delays and applying new methods to plan the arrival of materials, making a checklist of design drawings that have / have not been sent, making procedures for making and changing designs, updating the material list to facilitate material selection, improving coordination between consultants and field workers so that the design drawings can be said to be valid.

Item Type: Article
Uncontrolled Keywords: risk, cable tray support, house of risk, project, ARP
Subjects: Engineering > Industrial Engineering
Engineering
Divisions: Faculty of Engineering > Industrial Engineering Study Program
Depositing User: Muhammad Dany Fauzi
Date Deposited: 25 Jan 2024 06:38
Last Modified: 25 Jan 2024 06:38
URI: http://eprints.umg.ac.id/id/eprint/9392

Actions (login required)

View Item View Item