Items where Author is "Putra, Festo Renza Ardhana"

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Item Type | No Grouping
Number of items: 1.

Putra, Festo Renza Ardhana (2024) Project Delay Factor Analysis Using Fault Tree Analysis (FTA) Method and Rescheduling with Critical Path Method (CPM) in Ducting Manufacturing Projects at PT. FRA. Advance Sustainable Science, Engineering and Technology (ASSET), 6 (2). 02402017-01-02402017-08. ISSN 2715-4211

This list was generated on Sat Dec 21 09:25:26 2024 WIB.