Up a level |
Putra, Festo Renza Ardhana (2024) Project Delay Factor Analysis Using Fault Tree Analysis (FTA) Method and Rescheduling with Critical Path Method (CPM) in Ducting Manufacturing Projects at PT. FRA. Advance Sustainable Science, Engineering and Technology (ASSET), 6 (2). 02402017-01-02402017-08. ISSN 2715-4211